What is a lightning protection maintenance checklist?

A lightning protection system maintenance checklist is a structured list of the 12 preventive maintenance tasks — covering visual, functional and record-keeping checks — that keep a lightning protection system running safely and reliably. It groups routine checks by frequency, from daily inspections to annual servicing, so FM teams and building engineers can plan and evidence preventive maintenance.

Core lightning protection checks

  • Visually inspect air terminations, finials, and roof conductors for damage or corrosion
  • Inspect all test joints for corrosion and confirm they can be opened and remade
  • Record all test values and compare against previous readings for trend

What is a lightning protection system?

A lightning protection system gives a lightning strike a controlled path to earth so the energy bypasses the building's structure, services, and occupants. It comprises air terminations at roof level, down conductors routed to earth, test joints, and earth electrodes, with bonding to metallic services so no dangerous potential difference can develop between them during a strike.

BS EN 62305 is the governing standard and it drives both the design and the inspection regime. Systems are classified by protection level, determined by a risk assessment reflecting the building's exposure, use, and contents. That classification sets the inspection interval, which is why 'annual' is a reasonable default but not a universal answer — higher protection levels and systems in corrosive environments are inspected more often.

From an FM point of view lightning protection is a quiet asset: it does nothing visible, it is often the responsibility of nobody in particular, and its condition degrades invisibly through corrosion at buried joints and mechanical damage during roof works. The single most common finding is not a failed test but a conductor disconnected by another trade and never reinstated.

This checklist is one of 17 in our electrical maintenance checklists, covering distribution boards, switchgear, generators, UPS, solar PV and EV charging — inspection, testing and thermographic checks.

Typical Lightning protection maintenance checklist

A practical starting point for planned preventive maintenance. Always refer to the manufacturer's O&M manual and site-specific requirements.

Lightning Protection System maintenance checklist showing tasks such as visual check after any roof, facade and inspect accessible conductors for damage, each with its service frequency
A preview of the Lightning protection maintenance checklist — the full 12-task routine, service frequencies and safety notes are below, free to download as a PDF.

Visual Checks

  • Visually inspect air terminations, finials, and roof conductors for damage or corrosion
  • Check down conductors are continuous, securely fixed, and undamaged at low level
  • Inspect for damage or disconnection caused by recent roof or facade works
  • Confirm the system still matches the design after any structural or plant changes
  • Inspect earth pits for water ingress, damage, and accessibility

Functional Checks

  • Inspect all test joints for corrosion and confirm they can be opened and remade
  • Measure and record earth electrode resistance at each test point
  • Verify overall system continuity between air terminations and earth
  • Check bonding to metallic services, handrails, plant, and structural steel
  • Check surge protection devices for status indication and end-of-life

Record Keeping

  • Record all test values and compare against previous readings for trend
  • Update the system log book and issue the inspection certificate

Download the free Lightning protection maintenance checklist PDF

Get all 12 tasks as a printable PDF — free, no signup needed. Keep a copy in the plant room, attach it to work orders, or share it with your maintenance contractor.

PDF

The PDF is free and needs nothing. The Excel and Word versions add asset details, sign-off and findings columns so you can record the work as you do it — we ask for an email address for those.

Typical maintenance frequency

Suggested intervals for lightning protection system maintenance. Actual frequencies should follow manufacturer guidance and site-specific risk assessments.

Annually

  • •Full visual inspection
  • •Earth resistance testing at all test points
  • •Continuity and bonding verification
  • •Certificate and log book update

Quarterly

  • •Visual check after any roof, facade, or plant works
  • •Inspect accessible conductors for damage

Common faults and issues

Issues to be aware of when maintaining lightning protection system equipment.

Down conductors disconnected during roof or facade works and never reinstated
Corroded test joints that cannot be opened without breaking the connection
Rising earth electrode resistance as ground conditions or electrodes degrade
New rooftop plant installed without being bonded into the system
Earth pits buried, paved over, or inaccessible for testing
Surge protection devices at end of life with nobody monitoring the indicators

Safety and compliance notes

Key safety considerations for lightning protection system maintenance. This is general guidance only — always follow OEM instructions, statutory requirements, and your organisation's safe systems of work.

Do not inspect or test during thunderstorm activity or when one is forecast nearby
Roof-level work requires fall protection and a permit under the site's work at height arrangements
Treat conductors as potentially live during testing and use appropriate instruments and PPE
Confirm the earthing arrangement before disconnecting any test joint, and remake it immediately after
Coordinate with any works affecting the roof so the system is reinstated and re-tested

Reference standards and frameworks

United Kingdom
BS 7671 (IET Wiring Regulations) and the Electricity at Work Regulations 1989
North America
NFPA 70B (electrical equipment maintenance) and ANSI/NETA MTS

Frameworks commonly referenced when planning lightning protection maintenance programmes. Always confirm the requirements that apply to your site and jurisdiction.

How PM Assist helps

Managing Lightning protection documentation with PM Assist

PM Assist helps FM and building operations teams search their O&M manuals and building drawings in seconds. Upload your lightning protection system documentation and ask questions like “What protection level was this system designed to?” or “Where are the earth test points located?” — and get source-cited answers instantly.

The checklist tells you what to check. The manual tells you the numbers.

Ask a lightning protection manual a question and get the answer back with the page it came from. No signup, and you can drop in your own PDF instead of the sample.

“What protection level was this system designed to?”

Runs against a sample chiller manual so you can see the shape of the answer — then try it on one of yours.

Take this checklist with you

Download the branded PDF, generate a custom version for your asset, or run AI search across all your building documentation.

Instant download either way — the email is optional. One short email a month, unsubscribe anytime. See our privacy policy.

Generate a custom checklist

Compliance & CAFM

Run lightning protection system maintenance in PM Assist

This checklist is also a planned maintenance programme in PM Assist, included in every paid plan alongside the compliance register and mobile inspections.

  • Add a lightning protection system to a building's asset register and this maintenance programme is created for you, with each task on its frequency in the planner.
  • Lightning Protection System Test is tracked on the compliance register, with the date last done, the date next due and the certificate.
  • Contractors can be given a login to see their jobs and upload certificates.

Frequently asked questions

How often should lightning protection be tested?
Annually is the usual interval for most commercial buildings, but BS EN 62305 sets the frequency by protection level: systems at higher protection levels, and those in corrosive or exposed environments, are inspected more often. The design risk assessment determines the class and therefore the interval, so check the system's own documentation rather than assuming a general rule.
What earth resistance value should a lightning protection system achieve?
Design values are set by the system's own specification rather than a single universal figure, though 10 ohms is a commonly specified target for the overall system. What matters as much as the absolute value is the trend: a reading that has risen substantially since the last test indicates electrode or joint degradation even if it still sits within limits.
Does new rooftop plant need bonding into the lightning protection system?
Yes. Any new metallic plant, ductwork, handrail, or structure at roof level needs bonding into the system, and adding it without doing so is one of the most common ways a compliant system quietly becomes non-compliant. Rooftop solar, new AHUs, and telecoms equipment are frequent culprits — the works are managed by a different team from the one that owns the lightning protection.

Manage your building documentation with AI

PM Assist gives FM teams instant access to O&M manuals, drawings, and maintenance knowledge — all searchable with AI.

  • Upload and organise building documentation
  • AI-powered search across all your manuals
  • Source-cited answers for maintenance queries
  • Team collaboration and access control
  • No credit card required to start