Track every statutory duty across your portfolio, generate the maintenance programme from your asset register, and have AI read the certificates you already hold. 91 UK regimes configured out of the box.
Including the duties you hold no record for.
Most compliance software is bought and then abandoned half-configured, because somebody has to decide what to track and type it all in. That is the job you were trying to buy your way out of.
Tell us the property type and the duties that apply appear — every type in the catalogue carries at least 54. Each one shows as valid, expiring, overdue or missing. A duty with no record at all is shown as loudly as an expired one, because to an enforcing authority it usually is worse.
Register a passenger lift and you get its monthly alarm test and its six-monthly LOLER examination, tasks already written. 1,053 tasks across 133 asset types, each on the right frequency. A late visit never shifts the cycle.
18 ready-made forms with 169 checks between them — fire doors, emergency lighting, extinguishers, roofs — each with its pass condition and the standard behind it. Photograph what you find, sign it off, and turn a failed check into a tracked action in one tap.
Upload an EICR or a fire risk assessment and have its dates, certificate number and remedial actions extracted, each citing the page it came from. Nothing it finds counts towards compliance until you have checked it against that page and accepted it.
Give a supplier a login that shows only their work, in only their buildings. They report a job done and upload the certificate; you close it when you hold the evidence. Their uploads land in the document store and become searchable.
Which buildings have an expired EICR? When was the lift last serviced? What is still open from the last fire risk assessment? The assistant answers from the register and from the documents behind it, and says where each answer came from.
91 regimes across every property type — residential, mixed-use, office, retail, industrial, healthcare, education and leisure. Each one cites the regulation or standard it comes from.
FRA · Fire doors (common) · Flat entrance doors · Fire alarm
EICR · PAT · HV switchgear · EV charging
Asbestos survey · Asbestos re-inspection · EPC · Fall arrest
LOLER (passenger) · LOLER (goods) · Lift service · Lift alarm
Legionella RA · Water monitoring · Tank inspection · TMV servicing
H&S risk assessment · DSEAR · Racking · Access audit
TM44 · F-Gas · LEV (COSHH) · TR19 Grease
BSR registration · Safety case · Assessment certificate · MOR log
Gas safety (CP12) · Commercial gas · PSSR · Oil storage
Intruder alarm · CCTV · Access control
Standards and regulations cited
Regulatory Reform (Fire Safety) Order 2005, article 9 · Fire Safety Act 2021 · Fire Safety (England) Regulations 2022, regulation 10 · BS 5839-1 · BS 5266-1 / BS EN 50172 · BS 5306-3 · BS 9990 · BS 7346-8 / BS EN 12101 · BS 9999 Annex B / BS EN 15650 · BS 8524-2 · BS 7671 · Electricity at Work Regulations 1989 · IET Code of Practice · manufacturer's schedule · BS 7671 section 722 · IET Code of Practice for EV Charging Equipment · BS 7671 section 712 · MCS installation standards
Pick the property type and the duties that apply are suggested for you. Mark a building as higher-risk and the Building Safety Act duties appear alongside the rest.
Enter the last date and certificate for each duty, or upload the certificates in one go. On Pro, AI reads each one and proposes the dates and remedial actions for a person to check.
Every duty shows when it was last done, when it is next due, and where no record is held at all. Remedial actions carry a priority and a deadline.
Email reminders go out before duties fall due. Completed PPM visits and signed-off inspections are logged against their duty, and the register exports to CSV with the gaps listed as well as the records.
The 63 statutory duties PM Assist tracks, with the law or standard each comes from and its usual interval. Best-practice duties — insurer requirements, manufacturers’ schedules — are on the register too, and the product marks which are statutory so the two are never confused.
| Duty | Comes from | Interval |
|---|---|---|
| Fire Risk Assessment | Regulatory Reform (Fire Safety) Order 2005, article 9; Fire Safety Act 2021 | Reviewed annually, renewed on risk |
| Fire Door Checks — Common Parts | Fire Safety (England) Regulations 2022, regulation 10 | Quarterly |
| Fire Door Checks — Flat Entrance Doors | Fire Safety (England) Regulations 2022, regulation 10 | Annually |
| Fire Alarm & Detection Service | BS 5839-1 (non-domestic) / BS 5839-6 (domestic) | Every 6 months |
| Emergency Lighting Test | BS 5266-1 / BS EN 50172 | Monthly function test, annual duration test |
| Fire Extinguisher Service | BS 5306-3 (maintenance) / BS 5306-8 (provision) | Annual basic service |
| Dry Riser Test | BS 9990 | Annual pressure test, 6-monthly visual |
| Wet Riser Test | BS 9990 | Annual test, weekly pump test |
| Smoke Control & AOV Service | BS 7346-8 / BS EN 12101 | Annual service, monthly test |
| Fire Damper Drop Test | BS 9999 Annex B / BS EN 15650 | Annually |
| Fire Curtain & Shutter Service | BS 8524-2 | Every 6 months |
| Fire Evacuation Drill | Regulatory Reform (Fire Safety) Order 2005, arts. 15 & 21 | At least annually |
| Voice Alarm (PAVA) Service | BS 5839-8 | Every 6 months |
| Emergency Voice Communication (Refuge & Fire Telephones) | BS 5839-9 | Annual service |
| Gas Suppression System Service & Room Integrity Test | BS EN 15004-1; BS ISO 14520 | 6-monthly service, annual integrity test |
| Fire Safety Information to Residents | Fire Safety (England) Regulations 2022 | On moving in, then every 12 months |
| Firefighting Lifts & Equipment Monthly Check | Fire Safety (England) Regulations 2022 | Monthly |
| Secure Information Box & Building Plans | Fire Safety (England) Regulations 2022 | Kept current; reviewed at least annually |
| Duty | Comes from | Interval |
|---|---|---|
| LOLER Thorough Examination — Passenger Lift | Lifting Operations and Lifting Equipment Regulations 1998, regulation 9 | Every 6 months |
| LOLER Thorough Examination — Goods Lift | Lifting Operations and Lifting Equipment Regulations 1998, regulation 9 | Every 12 months |
| Lift Maintenance | BS EN 13015; supports LOLER and PUWER | Quarterly |
| Lift Emergency Alarm Test | BS EN 81-28 | Monthly |
| Escalator & Moving Walk Maintenance | BS EN 115-2; Provision and Use of Work Equipment Regulations 1998 | Quarterly service, annual safety inspection |
| Automatic Door Safety Inspection | BS EN 16005; Provision and Use of Work Equipment Regulations 1998 | Every 6 months |
| BMU & Access Cradle — LOLER Thorough Examination | Lifting Operations and Lifting Equipment Regulations 1998, reg. 9 | Every 6 months |
| Forklift Truck — LOLER Thorough Examination | Lifting Operations and Lifting Equipment Regulations 1998 | Every 12 months (6 if lifting people) |
| Duty | Comes from | Interval |
|---|---|---|
| Electrical Installation Condition Report | BS 7671 (IET Wiring Regulations); Electricity at Work Regulations 1989 | Every 5 years |
| In-Service Inspection of Electrical Equipment | Electricity at Work Regulations 1989; IET Code of Practice (5th edition) | Risk-based, commonly annual |
| HV Switchgear Maintenance | Electricity at Work Regulations 1989; manufacturer's schedule | Every 1–3 years |
| EV Charging Point Inspection | BS 7671 section 722; IET Code of Practice for EV Charging Equipment | Annually |
| Solar PV Inspection | BS 7671 section 712; MCS installation standards | Annually |
| Powered Gates, Barriers & Roller Shutters Service | Provision and Use of Work Equipment Regulations 1998; BS EN 12453 | Every 6 months |
| Waste Compactor & Baler Inspection | Provision and Use of Work Equipment Regulations 1998 | Annually (service and inspection) |
| Duty | Comes from | Interval |
|---|---|---|
| Legionella Risk Assessment | ACOP L8; HSG274; Health and Safety at Work etc. Act 1974 | Reviewed every 2 years, or on change |
| Legionella Control Monitoring | ACOP L8; HSG274 Part 2 | Monthly temperature monitoring |
| Cold Water Storage Tank Inspection | HSG274 Part 2; BS 8558 | Annually |
| Thermostatic Mixing Valve Servicing | HSG274 Part 2; HTM 04-01 (healthcare); BS 7942 | Annually, 6-monthly in healthcare |
| Backflow Prevention Device Test | Water Supply (Water Fittings) Regulations 1999 | Annually |
| Cooling Tower Notification & Treatment | Notification of Cooling Towers and Evaporative Condensers Regulations 1992; HSG274 Part 1 | 6-monthly clean, weekly monitoring |
| Shower Head Cleaning & Descaling | HSE HSG274 Part 2; ACOP L8 | Quarterly |
| Duty | Comes from | Interval |
|---|---|---|
| Asbestos Management Survey | Control of Asbestos Regulations 2012, regulation 4; HSG264 | Once, then kept up to date |
| Asbestos Re-inspection | Control of Asbestos Regulations 2012, regulation 4; HSG264 | At least annually |
| Energy Performance Certificate | Energy Performance of Buildings (England and Wales) Regulations 2012 | Every 10 years |
| Fall Arrest & Anchor Point Inspection | Work at Height Regulations 2005; LOLER 1998 regulation 9 for personal fall protection equipment; BS 7883 | Every 12 months |
| Waste Duty of Care | Environmental Protection Act 1990, s.34; Waste (England and Wales) Regulations 2011 | Carrier checks annually; notes kept 2–3 years |
| Heat Network Notification | Heat Network (Metering and Billing) Regulations 2014 | Every 4 years |
| Duty | Comes from | Interval |
|---|---|---|
| BSR Building Registration | Building Safety Act 2022, section 78; Higher-Risk Buildings (Registration Procedure) Regulations 2023 | Once, then kept current |
| Safety Case Report | Building Safety Act 2022, sections 83–85 | Reviewed annually, revised on change |
| Building Assessment Certificate | Building Safety Act 2022, sections 79–82 | On direction from the Regulator |
| Mandatory Occurrence Reporting | Building Safety Act 2022, section 87; Higher-Risk Buildings (Management of Safety Risks etc.) Regulations 2023 | Continuous; reviewed annually |
| Resident Engagement Strategy | Building Safety Act 2022, sections 91–93 | Reviewed every 2 years |
| Golden Thread Information | Building Safety Act 2022; Higher-Risk Buildings (Management of Safety Risks etc.) Regulations 2023 | Continuous; reviewed annually |
| Duty | Comes from | Interval |
|---|---|---|
| Landlord Gas Safety Record | Gas Safety (Installation and Use) Regulations 1998, regulation 36 | Every 12 months |
| Commercial Gas Safety Inspection | Gas Safety (Installation and Use) Regulations 1998; IGEM/UP standards | Annually |
| Pressure Systems Written Scheme Examination | Pressure Systems Safety Regulations 2000 | Per the written scheme (typically 12–36 months) |
| Oil Storage Tank Inspection | OFTEC TI/133; Control of Pollution (Oil Storage) Regulations 2001 | Annually |
| Duty | Comes from | Interval |
|---|---|---|
| Air Conditioning Inspection (TM44) | Energy Performance of Buildings (England and Wales) Regulations 2012; CIBSE TM44 | Every 5 years |
| F-Gas Leak Check | Retained Regulation (EU) 517/2014; Fluorinated Greenhouse Gases Regulations 2015 | Set by refrigerant charge (CO₂e) |
| LEV Thorough Examination & Test | Control of Substances Hazardous to Health Regulations 2002, regulation 9; HSG258 | At least every 14 months |
| Kitchen Extract Cleaning (TR19 Grease) | BESA TR19 Grease; Regulatory Reform (Fire Safety) Order 2005 | Set by cooking hours per day |
| Duty | Comes from | Interval |
|---|---|---|
| Health & Safety Risk Assessment | Management of Health and Safety at Work Regulations 1999, reg. 3 | Reviewed annually, and on change |
| DSEAR Risk Assessment | Dangerous Substances and Explosive Atmospheres Regulations 2002, reg. 5 | Reviewed regularly, and on change |
| Storage Racking Inspection | Provision and Use of Work Equipment Regulations 1998; BS EN 15635 / SEMA | Expert inspection every 12 months |
Most teams track compliance in a spreadsheet and a shared drive, or in an enterprise CAFM used for a fraction of what it does.
| Spreadsheet + shared drive | Enterprise CAFM | PM Assist | |
|---|---|---|---|
| UK duties set up for you | Build it yourself | Usually configured in an implementation project | 91 duties, out of the box |
| Shows duties with no record held | Only if someone notices | Depends on configuration | Yes, per building |
| Reads certificates for you | No | Varies by product | Yes, on Pro — a person checks each one |
| Search inside O&M manuals | File names only | Usually stored, not searched inside | Plain-English answers with the page cited |
| Time to first building | Days of setup | Typically an implementation project | Minutes, self-serve |
| Price to start | Staff time | Quote and contract | Free, then from £59/month |
Reading a fire risk assessment and pulling out twenty remedial actions is the single biggest time saving here. It is also the place where being wrong matters most, so it is built to be checked rather than trusted.
PM Assist never asserts that a building is compliant on the strength of a machine’s reading. A person does, having been shown the page it came from.
Tell us what the property is and what plant it has. We supply the duties, the tasks and the intervals. Start free on one building — no credit card.
Intervals in the catalogue are typical for each standard and are a starting point. The interval that applies to your building may be shorter — set by your risk assessment, your insurer or the equipment itself. Always confirm against the current regulation and your own assessments.
See also: maintenance checklists, inspection checklists and statutory compliance explained.