Pressure systems

PSSR Explained: Pressure Systems and the Written Scheme

Steam boilers, air receivers, and pressurised hot water plant sit under a regime many FM teams inherit without ever being handed the paperwork. This guide explains what PSSR requires, what a written scheme of examination is, and why the scheme itself is the document that matters most.

Diagram summarising what is PSSR written scheme of examination for facilities and estates teams, covering Which systems are covered and What the written scheme must cover

In short

PSSR is the Pressure Systems Safety Regulations 2000. It requires that pressure systems containing a relevant fluid are safe by design and installation, and that those parts which could cause danger if they failed are examined under a written scheme of examination drawn up or certified by a competent person.

Which systems are covered

PSSR applies to systems containing a relevant fluid: steam at any pressure, gases or gas mixtures above 0.5 bar gauge, and fluids that become gases when released. In a typical commercial building that captures steam boilers and their associated pipework and vessels, compressed air receivers, and some pressurised hot water and expansion arrangements. It does not apply to systems below the pressure threshold, which is why an ordinary sealed heating circuit generally falls outside it while a steam plant does not.

The scope question is worth settling deliberately rather than by assumption, because the boundary determines whether a written scheme is legally required or merely good practice. Where a site has a compressed air installation for controls or workshop use, it is very often in scope and very often the item nobody has a scheme for.

  • Steam at any pressure, including boilers, pipework, and vessels
  • Gases above 0.5 bar gauge — commonly compressed air receivers
  • Fluids kept as liquid that would become gas on release
  • Excludes systems below the pressure threshold, such as ordinary sealed heating circuits

What the written scheme must cover

The written scheme of examination is the core document. It is drawn up or certified by a competent person and specifies which parts of the system are to be examined, the nature of each examination, the maximum interval between examinations, and any measures needed to prepare the system for safe examination. It is specific to the installation rather than generic, which is why a scheme cannot simply be copied from another site.

The duty holder — the user for an installed system, the owner for a mobile one — must ensure the system is not operated without a scheme in place and that examinations happen within the intervals the scheme specifies. Reports of examination must be received and kept, and any repair or modification identified as necessary must be carried out within the stated timescale. Where the examination cannot be carried out safely, that itself is a finding rather than a reason to defer.

  • Which parts are examined and by what method
  • The maximum interval between examinations
  • Preparation needed for the examination to be carried out safely
  • Drawn up or certified by a competent person, specific to the installation

Where it goes wrong in practice

The recurring failure is not a missed examination but a missing scheme. Sites inherit plant through acquisition, mobilisation, or a change of managing agent, and the scheme — a document that lives with the installation rather than the maintenance contract — does not come across. The examinations may still be happening because an insurer arranges them, but nobody can produce the document that defines what should be examined and how often, which means nobody can confirm the examinations are adequate.

The second failure is the operating limits. A scheme is written against specific safe operating limits, and those limits must be established and observed. Where plant has been modified — a receiver replaced, a boiler re-rated, a system re-piped — the scheme needs revisiting rather than carrying on unchanged. Modification records and the original commissioning data are what make that judgement possible, which is why they are worth keeping findable.

Compliance & CAFM

Track pressure system examinations on a compliance register

PM Assist's building compliance software holds this duty on a register for every building you manage, included in every paid plan.

  • Pressure Systems Written Scheme Examination sits on the compliance register, showing when it was last done, when it is next due and the certificate behind it.
  • Duties with no record held are listed as gaps, so nothing is missed just because nobody logged it.
  • AI reads your certificates and proposes the dates and remedial actions; a person checks them against the source document before they count.

Sources

The regulatory positions on this page come from the following primary sources. Where guidance and legislation differ, the legislation governs — always confirm the requirements that apply to your own site and jurisdiction.

Frequently asked questions

Does PSSR apply to a compressed air receiver?
Usually yes. Compressed air above 0.5 bar gauge is a relevant fluid, so a typical workshop or controls air receiver falls within PSSR and needs a written scheme of examination. This is one of the most commonly missed items on an asset register, because the receiver is small, unglamorous, and often installed long before the current FM team arrived.
Who draws up a written scheme of examination?
A competent person — in practice usually an engineer surveyor from an insurance or independent inspection body, who has the knowledge to specify what needs examining and at what interval for that specific installation. The duty holder is responsible for ensuring a scheme exists and is followed, but not for writing it. The scheme must be certified as suitable, and it is specific to the installation rather than generic.
What is the difference between PSSR and PUWER?
PUWER is the general work equipment duty covering suitability, maintenance, inspection, and trained use. PSSR adds pressure-specific requirements on top of that for systems containing a relevant fluid — most importantly the written scheme of examination. A steam boiler is subject to both: PUWER for the general duties, PSSR for the examination regime.
How often must a pressure system be examined?
There is no universal interval. The written scheme specifies the maximum period between examinations for each part of the system, based on the competent person's assessment of that installation. Intervals commonly fall in the range of 12 to 72 months depending on the component and its duty, but the scheme governs — not a general rule of thumb.

Keep schemes and reports together

Written schemes, examination reports, and plant O&M manuals in one searchable library, so an inherited system's paperwork is findable when the examiner asks for it.

  • Upload and organise building documentation
  • AI-powered search across all your manuals
  • Source-cited answers for every query
  • Team collaboration and access control
  • No credit card required to start

Knowing the standard is one thing. Finding it in the paperwork is another.

Ask an O&M manual a question and get the answer back with the page it came from. No signup, and you can drop in your own PDF instead of the sample.

“When was the last F-Gas check?”

Runs against a sample chiller manual so you can see the shape of the answer — then try it on one of yours.